News feed
26 May 2010
Transportation of metallurgical equipment from the Netherlands

The multimodal transportation of oversized metallurgical equipment from Rotterdam (the Netherlands) to Magnitogorsk (Russia) was successfully completed.

24 May 2010
Transportation of oil and gas equipment

Another stage of transportation of petrochemical equipment for a large oil-producing enterprise in the Orenburg region is completed.

07 May 2010
Congratulations!

The resource is available only in the Russian version of the site. 

22 April 2010
Transportation of oil and gas equipment to Tatarstan

The oil and gas equipment, i.e. several aftercoolers were successfully delivered from St.Petersburg to Almetyevsk (Tatarstan). The lot of equipment included 2 oversized cargo pieces with the width of 4.1 m and with the height of 3.7 m as well as other cargo units.

09 April 2010
Transportation of metallurgical equipment

The transportation of metallurgical equipment from Finland to the Nizhny Novgorod Region, incl. 2 pieces with the following dimensions of each colli: 6,00 x 3,55 x 5,00 m, was successfully completed.

02 April 2010
Transportation of equipment Metso Lindemann

The metallurgical equipment Metso Lindemann was successfully delivered by TIS Group. The multimodal transportation was made along the route "Dusseldorf (Germany) - Khimki (Russia)".

198095, Russia, St.-Petersburg,   str. Marshala Govorova, 35A, 23-H, of. 620

Telefon: +7 (812) 740-20-22
Telefax: +7 (812) 740-35-60

sales@tis-spb.com